![]() | |||
|
| |||
|
|
|||
Recent Articles
|
« Older: Montgomery County Sheriff’s Department teaching youth about law enforcement and life Newer: NASA Hubble Space Telescope takes image of two puzzling galaxies in the Constellation of Centaurus »
Tennessee Department of Transportation Maintenance Work for Montgomery County area starting January 6th, 2013
One lane will remain open. Starting Thursday Monday January 7th through Wednesday January 9th, 9:00am-3:00pm, there will be alternating lane closures on SR 12 in both directions between mile markers 10.9 and 12.2 in order to mill, pave and stripe the roadway.One lane will remain open. TDOT Maintenance – Middle TennesseeMonday January 7th through Wednesday January 9th, 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:
Davidson CountyStarting Monday January 7th through Wednesday January 9th, 9:00am-3:00pm and 8:00pm-1:00am, there will be various shoulder closures for rock removal on all interstates. All lanes will remain open. Starting Monday January 7th through Wednesday January 9th, 8:00pm-1:00am, there will be alternating lane closures on various state routes for crack sealing. One lane will remain open. On Wednesday January 9th, 8:00pm-1:00am, there will be alternating lane closures on I-65 northbound at Trinity Lane Bridge for deck repair. Two lanes will remain open. Robertson CountyStarting Monday January 7th through Wednesday January 9th, 9:00am-3:00pm, there will be alternating lane closures on State Route 11 (U.S. 41) in both directions between mile markers 21, 22, 23 and 24 in order to mill, pave and stripe the roadway. One lane will remain open. Starting Monday January 7th through Wednesday January 9th, 9:00am-3:00pm, there will be alternating lane closures on SR 76 in both directions between mile marker 2.5 and mile marker 3.5 in order to mill, pave and stripe the roadway. One lane will remain open. Cheatham CountyStarting Monday January 7th through Wednesday January 9th, 9:00am-3:000pm, there will be alternating lane closures on State Route 249 in both directions between mile marker 0 and mile marker 0.5 in order to pave and stripe the roadway. One lane will remain open. Tennessee Department of TransportationMotorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. SectionsNewsTopicsCheatham County, Davidson County, Dickson County, Hickman County, Humphreys County, I-24, I-40, I-65, Interstate 24, Interstate 40, Interstate 65, Lane Closures, Montgomery County, Nashville TN, Robertson County, SR 11, SR-12, SR-249, SR-76, State Route 11, State Route 12, State Route 249, State Route 76, TDOT, TDoT Smartway, Tennessee Department of Transportation, U.S. 41, Williamson County |
Archives
|
|
© 2006-2010 Clarksville, TN Online is owned and operated by residents of Clarksville Tennessee.
| |||
Comments
You must be logged in to post a comment.
Enter your WordPress.com blog URL
http://.wordpress.com
Proceed