![]() | |||
|
| |||
|
|
|||
Recent Articles
|
« Older: Assuring consumers have access to mortgages they can trust Newer: Clarksville Montgomery County Schools opening Two Hours Late Monday due to Flooding »
Tennessee Department of Transportation Maintenance Work for Montgomery County area starting January 13th, 2013
One lane will remain open. TDOT Maintenance – Middle TennesseeOn Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:
Cheatham CountyOn Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on State Route 249 in both directions between mile marker 0 and mile marker 0.5 and between mile marker 23.0 and mile marker 24.0 in order to pave and stripe the roadway. One lane will remain open. On Monday January 14th through Wednesday January 16th, 7:00pm-5:00am, there will be one lane periodically closed on I-40 eastbound between MM 189.5 and MM 191.5 in order to patch potholes in the concrete bridge deck. One lane will remain open. Bridge Rehabilitation on SR 12 over Sycamore Creek – Look Ahead Thursday January 17th and Friday January 18th, 9:00am-3:00pm, the road will be closed for approximately 10 minutes at a time in order to unload and set bridge beams. Flaggers will be utilized. Davidson CountyOn Monday January 14th through Wednesday January 16th, 9:00am-3:00pm and 7:00pm-1:00am, there will be various shoulder closures for rock removal on all interstates. All lanes will remain open. On Monday January 14th through Wednesday January 16th, 8:00pm-1:00am, there will be alternating lane closures on various state routes for crack sealing. One lane will remain open. Robertson CountyOn Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on State Route 11 (U.S. 41) in both directions between mile markers 21 and 22 in order to mill, pave and stripe the roadway. One lane will remain open. On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on SR 76 in both directions between mile marker 2.5 and mile marker 3.5 in order to mill, pave and stripe the roadway. One lane will remain open. Tennessee Department of TransportationMotorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. SectionsNewsTopicsCheatham County, Davidson County, Dickson County, Hickman County, Humphreys County, I-40, Interstate 40, Lane Closures, Middle Tennessee, Montgomery County, Nashville TN, Robertson County, SR11, SR12, SR249, SR76, State Route 11, State Route 12, State Route 249, State Route 76, TDOT, TDoT Smartway, Tennessee Department of Transportation, U.S. 41, Williamson County |
Archives
|
|
© 2006-2010 Clarksville, TN Online is owned and operated by residents of Clarksville Tennessee.
| |||
Comments
You must be logged in to post a comment.
Enter your WordPress.com blog URL
http://.wordpress.com
Proceed