27.3 F
Clarksville
Tuesday, March 19, 2024
HomeNewsMontgomery County area TDOT Maintenance Work starting August 21st, 2013

Montgomery County area TDOT Maintenance Work starting August 21st, 2013

Tennessee Department of Transportation - TDOTNashville, TN – In Montgomery County, the Tennessee Department of Transportation (TDOT) reports that Thursday August 15th through Wednesday August 21st, 7:00pm-5:00am, there will be intermittent lane closures on State Route 112 (U.S. 41 A – Madison Street) between mile marker 9.0 and mile marker 10.0 in order to pave and stripe the roadway.

One lane will remain open in each direction.

On Thursday August 15th through Wednesday August 21st, 7:00pm-5:00am, there will be intermittent lane closures on State Route 374 (Richview Road) between mile marker 0 and mile marker 1.0 in order to pave and stripe the roadway.

One lane will remain open in each direction.

TDOT Maintenance: Middle Tennessee

Starting Thursday, August 15th through Wednesday, August 21st, 9:00am-3:00pm, (excluding weekends), there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:

  • I-24 Cheatham, Davidson, Montgomery and Robertson Counties
  • I-65 Davidson, Robertson, Williamson Counties
  • I-40 Cheatham, Davidson, Dickson, Hickman, Humphreys Counties

Cheatham County

On Thursday August 15th through Wednesday August 21st, 7:00pm-5:00am, one lane will be closed in both directions on I-40 in Cheatham County between mile marker 188 and mile marker 191.4 for pothole repair on the Harpeth River Bridge deck.

Davidson County

On Thursday August 15th through Wednesday August 21st, 9:00am-3:00pm and 7:00pm-1:00am, (excluding weekends), there will be various shoulder closures in Davidson County for rock removal on all interstates. All lanes will remain open.

On Thursday August 15th through Wednesday August 21st, 8:00pm-1:00am, (excluding weekends), there will be alternating lane closures on various state routes for crack sealing. One lane will remain open.

On Thursday August 15th and Monday August 19th through Wednesday August 21st, 9:00am-3:00pm and 8:00pm-5:00am, there will be mobile operations in various locations on the interstates in Davidson County for Drain Cleaning Operations. This will affect the shoulders or inside and outside lanes.

On Thursday August 15th, 8:00pm-5:00am, the two left lanes will be closed on I-24 eastbound between mile marker 47 and mile marker 49 for milling and paving. One lane will remain open.

On Tuesday August 20th, and Wednesday August 21st, 8:00pm-5:00am, there will be alternating lane closures on I-40 in both directions between mile marker 199 and mile marker 206 for milling and paving. One lane will remain open.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles