64.2 F
Clarksville
Thursday, April 18, 2024
HomeNewsClarksville Montgomery County area TDOT Maintenance Work starting February 13th, 2015

Clarksville Montgomery County area TDOT Maintenance Work starting February 13th, 2015

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) reports on Saturday February 14th, from 7:00am until 12:00noon, there will be rolling roadblocks on I-24 westbound, between MM 11 and MM 8, in order to move equipment and material across the interstate.

This is part of the bridge replacement project over Interstate 24 (Exit 8) on State Route 237.

Lane Closure

TDOT Maintenance: Middle Tennessee

On Friday February 13th through Wednesday February 18th, from 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as-needed basis:

  • I-24 Cheatham, Davidson, Montgomery and Robertson Counties
  • I-65 Davidson, Robertson, and Williamson Counties
  • I-40 Cheatham, Davidson, Dickson, Hickman, and Humphreys Counties

On Friday February 13th through Wednesday February 18th, from 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee for tree trimming and removal on an as-needed basis:

  • I-24 Cheatham, Montgomery and Robertson Counties
  • I-65 Maury and Robertson Counties
  • I-40 Cheatham, Dickson, Hickman and Humphreys Counties

Cheatham County

On Friday February 13th through Wednesday February 18th, from 9:00am-3:00pm, there will be alternating lane closures in both directions on SR 251 (River Road) from SR 249 to the Davidson County line in order to do slope mowing.

Davidson County

On Friday February 13th through Wednesday February 18th, from 8:00pm-5:00am, there will be mobile operations in various locations for drain cleaning operations.  This will affect the shoulders or inside and outside lanes.

On Friday February 13th, from 9:00am-3:00pm, there will be a lane closure on Gallatin Pike (US 31E/SR 6) eastbound at the railroad bridge in Madison for pavement sealing. One lane will remain open.  (weather dependent)

On Saturday February 14th, 9:00am-2:00pm, there will be alternating lane closures on I-65 northbound, between Rivergate Pkwy (Goodlettsville) and US 31W (Millersville), in order to patch the pavement. One lane will remain open.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles