Nashville, TN – The Tennessee Department of Transportation (TDOT) reports Friday May 15th, from 8:00pm through Monday May 18th, 5:00am, I-24 eastbound will closed at MM 8.0 for bridge construction. Traffic will be detoured utilizing the on- and off-ramps at SR 237 (Rossview Road).
This is part of the bridge replacement project over Interstate 24 (Exit 8) on State Route 237.
TDOT Maintenance: Middle Tennessee
On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00m, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as-needed basis:
- I-24 Cheatham, Davidson, Montgomery and Robertson Counties
- I-65 Davidson, Robertson, and Williamson Counties
- I-40 Cheatham, Davidson, Dickson, Hickman, and Humphreys Counties
On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee for tree trimming and removal on an as-needed basis:
- I-24 Cheatham, Montgomery and Robertson Counties
- I-65 Maury and Robertson Counties
- I-40 Cheatham, Dickson, Hickman and Humphreys Counties
Davidson County
On Thursday May 14th through Wednesday May 20th, from 8:00pm-5:00am, there will be mobile operations in various locations for sweeping operations. This will affect the shoulders or inside and outside lanes.
On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00pm, there will be alternating lane closures on I-40 eastbound between MM 201 (US 70/Charlotte Pike) and MM 204 (SR 155/Briley Parkway) for milling and paving. One lane will remain open.
On Thursday May 14th through Thursday May 14th, from 8:00pm-5:00am, there will be two lanes closed on I-65 northbound between Harding Place and Armory Drive for milling and paving. Two lanes will remain open.
Cheatham County
Bridge Replacement on I-40 over the Harpeth River
From now through July 2016, Anderson Road at the I-40 overpass will be closed. Detours are in place.
Tennessee Department of Transportation
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).
People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).
Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.