38 F
Clarksville
Thursday, March 28, 2024
HomeNewsClarksville-Montgomery County area TDOT Maintenance Work starting March 29th, 2018

Clarksville-Montgomery County area TDOT Maintenance Work starting March 29th, 2018

Tennessee Department of Transportation - TDOTNashville, TN – The Tennessee Department of Transportation (TDOT) reports that in Montgomery County there will be grading, drainage, construction of welded steel plate girder bridge, retaining wall and paving on Highway 149 and Highway 13 from River Road to Zinc Plant Road continuing daily from 9:00am until 3:00pm.

There will be temporary lane closure with flagging operations on Highway 13 for construction of new haul road.

Lane Closure

Davidson County

Resurfacing On I-24 From SR 6 To The I-40 Westbound Ramps & Bridge Rehab On I-24 Over Spring Street & Oldham Street

Nightly, from 8:00pm-5:00am, there will be alternating lane closures on Spring Street for texture coating of the bridge. One lane will remain open.

Nightly, from 8:00pm-5:00am, there will alternating lane closures on I-24 in both directions for milling and paving. One lane will remain open in each direction.

Look Ahead – Friday, April 13th, 8:00pm through Monday, April 16th, 6:00am – I-24 will be closed from the I-24/I-40 split to the I-65 split. For more information, see: www.tn.gov/tdot/projects/region-3/interstate-24-bridge-rehabilitation.html


On Monday, April 2nd through Wednesday, April 4th, from 8:00pm until 5:00am, as weather permits, there will be two lanes closed on I-24 westbound between Hickory Hollow Parkway and Harding Place for milling and paving work. Two lanes will remain open.

On Tuesday, April 3rd, from 9:00pm until 5:00am, the ramp from I-24 westbound to I-40 westbound towards downtown will be closed for approximately five hours between 9:00pm and 5:00am for milling and paving operations. Check smartway.tn.gov for real-time traffic information and cameras.

Robertson County

Construction of new interchange on I-65 at SR 109
From now through April 2018, the inside lane on I-65 northbound at MM 121 will be closed for removal of existing median wall and construction of new overhead signs. Two lanes will remain open in each direction.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

Looking Ahead, on Friday, April 13th, 8:00pm through Monday, April 16th, 6:00am, – I-24 will be closed from the I-24/I-40 split to the I-65 split.

RELATED ARTICLES

Latest Articles