![]() | |||
| |||
|
|||
Recent Articles
|
« Older: TBI Top Ten Most Wanted Tyler Raybon-Tate captured by Law Enforcement in Nashville Newer: Nashville Sounds get swept by Albuquerque Isotopes with 9-2 loss Wednesday night »
Montgomery County area Tennessee Department of Transportation Maintenance Work starting July 11th, 2013
There will be no lane closures this week. TDOT Maintenance: Middle TennesseeOn Thursday, July 11th through Wednesday, July 17th, 9:00am-3:00pm, (excluding weekends), there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:
Davidson CountyOn Thursday July 11th through Wednesday July 17th, 9:00am-3:00pm and 7:00pm-1:00am, (excluding weekends), there will be various shoulder closures in Davidson County for rock removal on all interstates. All lanes will remain open. On Thursday July 11th through Wednesday July 17th, 8:00pm-1:00am, (excluding weekends), there will be alternating lane closures on various state routes for crack sealing. One lane will remain open. On Thursday July 11th and Monday July 15th through Wednesday July 17th, 9:00am-3:00pm and 8:00pm-5:00am, there will be mobile operations in various locations on the interstates in Davidson County for Drain Cleaning Operations. This will affect the shoulders or inside and outside lanes. On Monday July 15th through Wednesday July 17th, 8:00pm-5:00am, there will be alternating lane closures on I-40 in both directions between mile marker 196 and mile marker 205 for milling, paving and bridge end repair. One lane will remain open. On Thursday July 11th, 8:00pm-5:00am, the two left lanes will be closed on I-24 eastbound between mile marker 47.0 and mile marker 49.0 for milling and paving. One lane will remain open. Tennessee Department of TransportationMotorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. SectionsNewsTopicsbridge repair, Cheatham County, Davidson County, Dickson County, Hickman County, Humphreys County, I-24, I-40, I-65, Interstate 24, Interstate 40, Interstate 65, Lane Closures, Middle Tennessee, Milling, Montgomery County, Nashville TN, paving, Robertson County, Robertson County Line, SR-76, State Route 76, TDOT, Tennessee Department of Transportation, Williamson County |
Archives
|
|
© 2006-2021 Clarksville, TN Online is owned and operated by residents of Clarksville Tennessee.
|
Comments
You must be logged in to post a comment.