41.9 F
Clarksville
Friday, March 29, 2024
HomeNewsClarksville Montgomery County area TDOT Maintenance Work starting May 14th, 2015

Clarksville Montgomery County area TDOT Maintenance Work starting May 14th, 2015

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) reports Friday May 15th, from 8:00pm through Monday May 18th, 5:00am, I-24 eastbound will closed at MM 8.0 for bridge construction. Traffic will be detoured utilizing the on- and off-ramps at SR 237 (Rossview Road).

This is part of the bridge replacement project over Interstate 24 (Exit 8) on State Route 237.

Lane Closure

TDOT Maintenance: Middle Tennessee

On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00m, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as-needed basis:

  • I-24 Cheatham, Davidson, Montgomery and Robertson Counties
  • I-65 Davidson, Robertson, and Williamson Counties
  • I-40 Cheatham, Davidson, Dickson, Hickman, and Humphreys Counties

On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee for tree trimming and removal on an as-needed basis:

  • I-24 Cheatham, Montgomery and Robertson Counties
  • I-65 Maury and Robertson Counties
  • I-40 Cheatham, Dickson, Hickman and Humphreys Counties

Davidson County

On Thursday May 14th through Wednesday May 20th, from 8:00pm-5:00am, there will be mobile operations in various locations for sweeping operations. This will affect the shoulders or inside and outside lanes.

On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00pm, there will be alternating lane closures on I-40 eastbound between MM 201 (US 70/Charlotte Pike) and MM 204 (SR 155/Briley Parkway) for milling and paving. One lane will remain open.

On Thursday May 14th through Wednesday May 20th, from 9:00am-3:00pm, (excluding weekend), there will be alternating lane closures on SR 6 (Ellington Pkwy) in both directions between MM 11 (Trinity Lane) and MM 13 (Broadmoor Drive) for pavement repair. One lane will remain open.

On Thursday May 14th through Thursday May 14th, from 8:00pm-5:00am, there will be two lanes closed on I-65 northbound between Harding Place and Armory Drive for milling and paving. Two lanes will remain open.

Cheatham County

Bridge Replacement on I-40 over the Harpeth River

From now through July 2016, Anderson Road at the I-40 overpass will be closed. Detours are in place.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles