41.9 F
Clarksville
Friday, March 29, 2024
HomeNewsClarksville Montgomery County area TDOT Maintenance Work starting March 17th, 2016

Clarksville Montgomery County area TDOT Maintenance Work starting March 17th, 2016

Tennessee Department of Transportation - TDOTNashville, TN – The Tennessee Department of Transportation (TDOT) reports that on Saturday, March 19th, from 5:00am until 10:00am (weather permitting), there will be a lane closure on I-24 eastbound at MM 7 (north of 237) to excavate the diesel fuel impacted soil from the shoulder and remediate the project site.

Lane Closure

 

Cheatham County

Bridge Replacement on I-40 over the Harpeth River
From now through July 2016, Anderson Road at the I-40 overpass will be closed. Detours are in place.

Dickson County

Paving on I-40 at MM 174
Thursday March 17th, 6:00pm through Friday March 18th, 5:00am, there will be a lane closure on I-40 eastbound from MM 174 to MM 176 (SR 840) for milling & paving operations. State troopers will be present.

Davidson County

Installation of an Overhead Sign Structure on I-24WB
On Thursday March 17th and Friday March 23rd, from 9:00am-3:00pm (excluding weekends), There will be a shoulder closure on I-24 westbound at MM 54 (Briley Parkway) to install overhead sign footings.

On Thursday March 17th through Wednesday March 23rd, from 9:00am-3:00pm, there will be partial ramp closure on I-24 westbound at MM 54 (Briley Parkway) to install overhead sign footings. Ramp will remain open and two lanes of traffic will remain open.

Davidson County

Widening on I-65 from Trinity Lane to Dickerson Pike and Noise Walls on I-65
On Thursday March 17th, Friday March 18th and Monday March 21st through Wednesday March 23rd, from 9:00am–3:00pm, there will be possible lane closures of I-65 in both directions from MM 87 (Trinity Lane) to MM 90 (Dickerson Road) to allow for guardrail repair, texture coating, ground mounted sign installation, and light pole installation.

Davidson County

On Thursday March 17th through Wednesday March 23rd, from 8:00pm-5:00am, there will be mobile operations in various locations for drainage grate cleaning.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles