47.8 F
Clarksville
Thursday, March 28, 2024
HomeNewsClarksville-Montgomery County area TDOT Work starting July 27th, 2018

Clarksville-Montgomery County area TDOT Work starting July 27th, 2018

Tennessee Department of Transportation (TDOT)

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) reports that in Montgomery County on SR 149 and SR 13 there will be Grading, Drainage, and Construction of Bridge work, as well as Retaining Wall work and Paving from River Road to Zinc Plant Road on Friday, July 26th, 2018 through through Wednesday, August 1st, from 9:00am-3:00pm.

There will be periodic flagging operations along SR 13 and SR 149 for clearing and grade work operations.

Road Closure

Montgomery County

SR 374 (Warfield Boulevard) Widening from South of Dunbar Cave Road to West of Stokes Road
On Friday, July 27th through Wednesday, August 1st, from 9:00am-3:30pm, there will be intermittent road closures on Warfield Boulevard, between Dunbar Cave Road and Stokes Road, for pre-split blasting. All traffic will be halted during the blasting process until all debris is removed from roadway.

On Tuesday, July 31st, from 7:00pm-2:00am, there will be temporary lane closures on I-24 in both directions, between mile markers 9 and 10, for milling and paving operations.

Cheatham County-Robertson County

I-24 Resurfacing
On Sunday, July 29th through Wednesday, August 1st, from 8:00pm-6:00am, there will be nightly lane closures on I-24 in both directions, between mile markers 24 and 37, for milling and paving operations. State Troopers will be utilized for traffic control.

Davidson County

I-40 Resurfacing from Cheatham County Line to US 70S (SR 1)
On Friday, July 27th through Tuesday, July 31st (excluding Saturday), from 8:00pm-5:00am, there will be alternating lane closures on I-40 in both directions, between mile markers 191 and 196, for final pavement markings. One lane will remain open in each direction.

Dickson County-Williamson County

I-40 East Construction of Truck Climbing Lane near Mile Marker 180
On Tuesday, July 31st, from 10:00pm-4:00am, I-40 East will be temporarily CLOSED, between mile markers 180 and 183, for emergency guardrail repair. Detours will be in place.

On Friday, July 27th through Wednesday, August 1st, from 8:00pm-6:00am, there will be a temporary lane closure on I-40 in both directions, between mile markers 180 and 183, for final pavement markings. One lane will remain open in each direction.

Robertson County

New Interchange Construction on I-65 at SR 109
Now through July 2018 (continuous), The inside lane of I-65 North will be closed, between mile markers 118 and 121, for removal of existing median wall and construction of new overhead signs. Two lanes will remain open in each direction.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles