41.9 F
Clarksville
Friday, March 29, 2024
HomeNewsClarksville-Montgomery County area TDOT Work starting January 25th, 2019

Clarksville-Montgomery County area TDOT Work starting January 25th, 2019

Tennessee Department of Transportation (TDOT)

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) reports that in Montgomery County there will be on-call concrete repair at the Welcome Center for for concrete ramp and pavement repairs the weekend of Friday, January 25th, 2019

The right lane on I-24 EB will be closed until the concrete is placed. The work will take approximately 12 hours to complete – the timing depends on weather.

Lane Closure

Davidson County

I-24 Interchange Improvements at Hickory Hollow Parkway (MM 62)
Nightly, from 8:00pm-5:00am, there will be alternating lane and ramp closures on I-24 in both directions from MM 60-63 for bridge demo work.

Interstate 440 Reconstruction
From now through January 2019, There will be a shoulder and auxiliary lane closure on I-440 eastbound between the Woodlawn and Sharondale overpasses for noise wall construction.

From now through February 2019, There will be a shoulder and auxiliary lane closure on I-440 eastbound between the Granny White Pike to Craig Street for noise wall construction.

Survey Work on I-65
On Saturday, January 26th, from 7:00am-10:00am, There will be periodic inside shoulder and inside lane closures on I-65 in both directions between MM 95-96 for survey work to locate storm sewer inverts along the median barrier wall. Sunday, January 27th will be the alternate date if weather prohibits work on Saturday.

Dickson County

On Tuesday, January 29th through Thursday, January 31st, from 7:00pm-3:00am, there will be a lane closure on I-40 westbound at MM 177 to repair joints on the bridge over I-840.

Robertson County

SR 161 Bridge Repair
From now through spring 2019, the bridge will be reduced to one lane for repairs. Traffic will be controlled by a temporary signal.

 

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles