34.5 F
Clarksville
Thursday, March 28, 2024
HomeNewsClarksville-Montgomery County area TDOT Work starting November 20th, 2020

Clarksville-Montgomery County area TDOT Work starting November 20th, 2020

Tennessee Department of Transportation (TDOT)

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) in Montgomery County will be doing resurfacing on SR 374 from the bridge over US 79 (SR 13) (LM 5.27) to the bridge over US 41A (SR 12) (LM 11.70).

Nightly, from 10:00pm-5:00am, there will be lane closures for resurfacing operations.

Lane Closure

 

Montgomery County

Sidewalk Construction on SR 13 (LM 23-26)
Nightly, from 12:00am-11:00am, there will be a lane closure for construction work.

Resurfacing on SR 13 between LM 26-27
Nightly, from 10:00pm-5:00am, there will be lane closures for resurfacing operations.

Davidson County

On Monday, November 23rd, from 8:00pm-5:00am, there will be lane closures on I-40 at MM 203-199 for milling and paving.

Widening SR 112 (Clarksville Highway) from SR 155 to SR 12
Daily, from 9:00am-3:00pm, there will be lane closures for construction activities.

Ramp Improvements on I-65 northbound exit to Harding Place (Exit 78)
Nightly, from 8:00pm-5:00am, there will be lane closures on I-65 northbound at the Harding Place exit to make attenuator repairs. The ramp will remain open.

I-24 Interchange Improvements at Hickory Hollow
Nightly, from 8:00pm-5:00am excluding Friday and Saturday, there will be lane closures and rolling roadblocks on I-24 in both directions at MM 60 for bridge construction activities.

Resurfacing on I-24 from SR 45 (Old Hickory Blvd) to I-65, including bridge expansion joint repair
Nightly, from 9:00pm-5:00am, there will be lane closures on I-24 in both directions between MM 40-44 for construction operations.

Dickson County

Paving on I-40
Nightly from 7:00pm-6:00am, there will be intermittent lane closures for paving operations between MM 172-176.

 

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

From now through spring 2019, the bridge at LM 9 will be reduced to one lane for repairs. Traffic will be controlled by a temporary signal.

RELATED ARTICLES

Latest Articles