59.5 F
Clarksville
Friday, April 19, 2024
HomeNewsTennessee Department of Transportation Maintenance Work for Montgomery County area starting January...

Tennessee Department of Transportation Maintenance Work for Montgomery County area starting January 13th, 2013

Tennessee Department of TransportationNashville, TN – On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on State Route 12 in both directions between mile markers 10.9 and 12.2 in order to mill, pave and stripe the roadway.

One lane will remain open.

TDOT Maintenance – Middle Tennessee

On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:

  • I-24 Cheatham, Davidson, Montgomery and Robertson Counties
  • I-65 Davidson, Robertson, Williamson Counties
  • I-40 Cheatham, Davidson, Dickson, Hickman, Humphreys Counties

Cheatham County

On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on State Route 249 in both directions between mile marker 0 and mile marker 0.5 and between mile marker 23.0 and mile marker 24.0 in order to pave and stripe the roadway. One lane will remain open.

On Monday January 14th through Wednesday January 16th, 7:00pm-5:00am, there will be one lane periodically closed on I-40 eastbound between MM 189.5 and MM 191.5 in order to patch potholes in the concrete bridge deck. One lane will remain open.

Bridge Rehabilitation on SR 12 over Sycamore Creek – Look Ahead

Thursday January 17th and Friday January 18th, 9:00am-3:00pm, the road will be closed for approximately 10 minutes at a time in order to unload and set bridge beams. Flaggers will be utilized.

Davidson County

On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm and 7:00pm-1:00am, there will be various shoulder closures for rock removal on all interstates. All lanes will remain open.

On Monday January 14th through Wednesday January 16th, 8:00pm-1:00am, there will be alternating lane closures on various state routes for crack sealing. One lane will remain open.

Robertson County

On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on State Route 11 (U.S. 41) in both directions between mile markers 21 and 22 in order to mill, pave and stripe the roadway. One lane will remain open.

On Monday January 14th through Wednesday January 16th, 9:00am-3:00pm, there will be alternating lane closures on SR 76 in both directions between mile marker 2.5 and mile marker 3.5 in order to mill, pave and stripe the roadway. One lane will remain open.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather.  For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ).  TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

RELATED ARTICLES

Latest Articles