69.3 F
Clarksville
Tuesday, April 23, 2024
HomeNewsClarksville-Montgomery County area TDOT Work starting May 7th, 2021

Clarksville-Montgomery County area TDOT Work starting May 7th, 2021

Tennessee Department of Transportation (TDOT)

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) in Montgomery County will be doing widening on SR 149 and SR 13/48.

Daily, from 9:00am-3:00pm, there will be intermittent road closures for blasting activities on SR 13 and 149 near the Cumberland River.

Road Closure

 

Cheatham County

On Saturday, May 8th, from 6:00am-12:00pm, there will be intermittent lane closures on I-40 between MM 183-189 for slope mowing.

Davidson County

Widening SR 112 (Clarksville Highway) from SR 155 to SR 12
Daily, from 9:00am-3:00pm, there will be lane closures for construction activities.

ITS Maintenance
On Friday, May 7th, from 8:00pm-2:00am, there will be a lane closure on I-65 northbound at Long Hollow Pike.

On Friday, May 7th, from 8:00pm-2:00am, there will be a lane and shoulder closure on Vietnam Veterans Boulevard westbound at Center Point Road.

The repair of bridges on I-40 over Stones River and on SR 171 over Stones River
Daily, from 8:30am-3:00pm, there will be temporary, intermittent lane closures on the SR 171 (Hobson Pike) bridge over the Stones River for partial depth deck repair.

Ramp Improvements on I-65 NB at Harding Place
Nightly, from 8:00pm-5:00am, there will be lane closures on I-65 NB (MM 78) just before the Harding Place ramp to install new full depth pavement widening.

Interchange Improvements at I-24 and Hickory Hollow Parkway
Nightly, from 8:00pm-5:00am, there will be lane closures for construction activities.

 

Humphreys County

Repair of bridges over I-40 over the Buffalo River
On Sunday, May 9th through Thursday, May 13th, there will be a continuous lane closure on I-40 eastbound to repair joints on the Buffalo River Bridge (MM 140-142).

Robertson County

Nightly, from 8:00pm-5:00am, there will be lane closures on I-65 between MM 104-118 for in-place paving.

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather-dependent and subject to change due to inclement weather.

For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System website ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up-to-date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up-to-date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

 

 

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting, or using a mobile phone while operating a vehicle.

From now through spring 2019, the bridge at LM 9 will be reduced to one lane for repairs. Traffic will be controlled by a temporary signal.

RELATED ARTICLES

Latest Articles