Nashville, TN – The Tennessee Department of Transportation (TDOT) in Montgomery County will be doing intersection improvements, grading, drainage, and construction of retaining walls on SR 112 / SR 76.
Nightly from 8:00pm until 5:00am, there will be temporary lane closures in both directions for thermoplastic and pavement marking placements.
Montgomery County – I-24
The resurfacing on I-24 from east of SR 13 (US-79) to west of Trough Springs Road.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures in both directions for rumble strips, thermoplastic, and pavement markings.
Davidson County – I-24
The resurfacing on I-24 from Haywood Lane to the Rutherford County line.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures in both directions for texture coat application.
8/15 at 8:00pm through 8/17 at 5:00am, there will be a triple lane closure on I-24 eastbound at Haywood Lane for bridge repair. Two lanes are expected to re-open Saturday morning once concrete is poured.
Davidson County – I-40
The grading, drainage, construction of bridges, retaining walls and paving on SR 255 and I-40 at the Donelson Pike Interchange.
Nightly, 8:00pm – 4:00am, there will be alternating triple lane closures on I-40 in both directions for milling and paving operations.
The repair of the bridge on I-40 over the Harpeth River including grading, drainage, and paving.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures in both directions on I-40 for bridge repair work (MM 194 – 196).
The resurfacing on I-40 from 46th Avenue to near Jefferson Street including bridge expansion joint repair.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures on I-40 in both directions for sign installation.
Davidson County – I-65
Resurfacing on I-65 from near Armory Drive to I-40.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures on I-65 in both directions for milling, paving, traffic loops, and texture coating (MM 79 – 85).
The resurfacing on I-65 from I-40 to near the Cumberland River Bridge.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures on I-65 in both directions for pavement marking (MM 84 – 87.4).
Davidson County – I-440
SmartWay Intelligent Transportation System installation and maintenance.
8/14, 8:00pm – 4:00am, there will be intermittent lane closures on I-440 for Highway Advisory Radio sign repair (MM 0 – 1 (eastbound), MM 6 – 7 (westbound)).
Vegetation removal.
8/16, 7:00am – 3:00pm, there will a single right lane closure for vegetation removal from sound wall.
Davidson County and Sumner County – I-65
I-65 widening and improvements from near Rivergate Parkway to near US 31W (SR 41).
Daily, 9:00am – 3:00pm, there will be alternating lane closures on SR 174 (Long Hollow Pike) and US-31W for bridge work (MM 95 – 99). One lane will remain open in both directions.
Nightly, 8:00pm – 5:00am, there will be lane closures on I-65 in both directions for construction activities (MM 95 – 99). there will also be intermittent ramp closures at SR 174 (Long Hollow Pike) and US-31W (SR 41) as needed.
Nightly, (excluding weekends), 8:00pm – 5:00am, East Cedar Street will be closed for bridge construction activities.
Dickson County – SR 46
The construction of a box beam bridge on SR 46 over Yellow Creek.
Continuous, The bridge will be reduced to one lane to demo the existing structure and reconstruct the new bridge. Traffic will be controlled by temporary signals (MM 19.06).
Dickson County and Hickman County – I-40
The resurfacing of I-40 in Dickson and Hickman Counties from the Humphreys County line to near East Piney Road.
Nightly, 8:00pm – 5:00am, there will be alternating lane closures in both directions for paving operations (MM 160.4 – 168.8).
Humphreys County – I-40
The repair of bridges on I-40 over Squeeze Bottom Road and Buffalo River Bridge.
Nightly, 7:00pm – 5:00am, there will be temporary lane closures on I-40 in both directions for roadway maintenance as needed. One lane will always remain open (MM 140 – 142).
SmartWay Intelligent Transportation System installation and maintenance.
Nightly, 7:00pm – 6:00am, there will be alternating lane closures in both directions for the installation of fiber (MM 135 – 148.1).
Tennessee Department of Transportation
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. The contractors provide Information in this report to the Department of Transportation. Most work is weather-dependent and subject to change due to inclement weather.
For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System website ( www.tn.gov/tdot/tdotsmartway/ ).
People can also dial 511 from any landline or cellular phone to access up-to-date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up-to-date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).
Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting, or using a mobile phone while operating a vehicle.