49.7 F
Clarksville
Thursday, April 25, 2024
HomeNewsClarksville-Montgomery County area TDOT Work starting April 17th 2020

Clarksville-Montgomery County area TDOT Work starting April 17th 2020

Tennessee Department of Transportation (TDOT)

Tennessee Department of Transportation - TDOT

Nashville, TN – The Tennessee Department of Transportation (TDOT) reports that in Montgomery County there will be sidewalk construction on SR 13 (Highway 48 and 13).

Nightly from 10:00pm until 5:00am there will be a lane closure for the construction work.

Lane Closure

 

Cheatham County

Slope Stabilization on US 70 near LM 6.2
From now through May 2020, there will be a lane closure on US 70 between LM 6 and 7 (between Shady Grove Lane and Tanglewood Drive) for slope stabilization work. Temporary traffic signals will be used during construction.

Bridge Repair on SR 249 at MM 26
From now through July 2020, the roadway will be reduced to one lane, controlled by a temporary signal, for full depth deck repairs.

Davidson County

Interstate 440 Reconstruction
Nightly, from 9:00pm-5:00am, there will be intermittent ramp closures at Nolensville Pike, Murphy Road, West End Avenue, Hillsboro Pike, and I-65 for phase 2 ramp construction. Detours will be in place.

Nightly, from 9:00pm-5:00am, there will be a right lane closure on SR-1; West End Avenue northbound between Elmington Avenue and I-440 for concrete flatwork and detour removals. There will be a right shoulder closure on EB I-440 from Nolensville Pike to I-24, I-24 On and Off Ramps, and I-40 On and Off Ramps for roadway lighting. There will also be rolling roadblocks as needed for sign installation.

From now through August 2020, I-440 will be restricted to two travel lanes in each direction from 5:00am-9:00pm and one travel lane in each direction from 9:00pm-5:00am.

I-24 Interchange Improvements at Hickory Hollow
From now through August 2020 – The entrance ramp to I-24 westbound from Hickory Hollow Parkway (MM 60) will be closed for ramp reconstruction.

Nightly, from 8:00pm-5:00am, there will be a lane closure on I-24 EB at Exit 60 for installation of overhead signs.

Widening SR 112 (Clarksville Highway) from SR 155 to SR 12
Daily, from 9:00am-3:00pm, there will be lane closures for clearing/grubbing and construction activities.

Humphreys County

On Monday, April 20th, from 7:00am-3:3pm, there will be a lane closure on I-40 at MM 138-139 for pothole patching.

 

Tennessee Department of Transportation

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ).

People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ).

Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle.

From now through spring 2019, the bridge at LM 9 will be reduced to one lane for repairs. Traffic will be controlled by a temporary signal.

RELATED ARTICLES

Latest Articles